Progress in South Oxfordshire

Project News Posted on 10 Sep, 2016 16:39

External envelope gets up to wall plate. New apertures are being formed in the existing and roof should be formed in the next month.
Brick work is shaping up really well with the new blue-header flemish bond (to match existing) sitting well with the new stretcher bond.



Not so good for basketball anymore

Project News Posted on 08 Sep, 2016 13:41

Work proceeds converting the old sports hall to new offices for the Estates and IT services at Derby University.



Initial structure complete in South Oxfordshire

Project News Posted on 05 Jul, 2016 18:27

The first image (from a site visit in late June), shows some of the steels that will form the new glass wall opening to the dining extension, which projects forward of the main new house construction.
The second image is a view from the new front door porch through what will be the stair way and the feature window (which will rise to the top of the steel columns) orientated on the mature tree in the garden.



House well under way in Stratford

Project News Posted on 05 Jul, 2016 18:20

Visited site on one of the rarer sunny days in this last month. Works are proceeding at pace with fenestration in, roof lights and skylights in and the external finishes nearing completion for a watertight envelope. The ground floor stone finish is to be added to the study/office extension. The perspective views of the house have featured previously and I’m pleased with the similarity between those and the photos that are already showing.

The first image is the view from the driveway, the second the view from the second floor balcony as will be looking down through the triple height hallway to the entrance.



Demolition

Project News Posted on 14 Jun, 2016 16:13

Demolition has quickly progressed and completed at the house in South Oxfordshire. Foundation works and underground masonry is currently on-going.Now (above) and before work commenced (below)



Anglia Ruskin Sports and Exercise Science, Music Technology, and Computer Gaming Studies students get new accommodation

Project News Posted on 17 Apr, 2016 18:21

Compass House is now in full operation with the three departments moved in an the facilities in operation. Soft landscaping remains to be completed but otherwise the site redevelopment is complete.
Coffee, socialising, and laboratory studies are being carried out in the former undercroft car park area. The once open plan upper floors office spaces now have structure within structure acoustically isolated music recording suites and multiple teaching and learning spaces with more than their fair share of IT equipment.

The University’s own website describes the centre more succinctly than I could as follows:

“Our gaming, music technology and sports and exercise science students will have a new home in Compass House, which will extend our campus along East Road. We’re investing more than £3.5million in new facilities, including recording studio suites, Development Labs for computer sciences, Digital Systems Design Labs, Video Labs, AV Labs, two lecture theatres – one of which will be a Critical Listening Theatre. Our gaming and music technology students will have the latest equipment, and be able to collaborate with other students on innovative projects to hone their skills.”

A project page will be added to the portfolio in due course but for the time being some photos are added here in no particular order:

New Student entrance

New fabric to the undercroft space

New cafe space in the old undercroft

New sports and exercise multi purpose laboratory
Sports physiology laboratory

Critical listening lecture theatre, acoustically separated construction.

Sports and Exercise Science Accommodation



Assistance at Olympic Park fit-out

Project News Posted on 14 Dec, 2015 20:41

a:nw is delighted to be assisting in the technical design for a new 4 storey Higher Education fit out at the Olympic Park site in East London working together with Paragon Interiors.



Handover and building control approval at Anglia Ruskin University

Project News Posted on 14 Dec, 2015 19:54

There are still some packages to be completed, principally the external rain screen, but otherwise the renovated and adapted building is being handed over to the university in time for the Christmas break for their FFE fit out. The following are some photos of the spaces nearing completion and some of the rooms in use from the partial possession of the upper floors a couple of months ago.
One section of the rain screen nearly complete, the following shows there is a few weeks to go on the sports hall.Decoration is close to completion within though.
The cafe space – originally the road way into the undercroft car park waiting for the FFE, vending and servery fit out. The remainder of the undercroft now being kitted out as Sports Physiology laboratories.One of the six recording studios and the main ‘live room’ that coupled with two lecture theatres, as well as computer science and electronics classrooms and laboratories, form the core of the accommodation on the first floor.Student break out space, on the second floor alongside the computer gaming technology department.A standard classroom in the department.